- 020 8050 1701
- info@engmasterconsulting.com
- 20-22 Wenlock Street London
Home / Sample Projects
The project involved design of a temporary pipe bridge to support an existing gas main to enable a culvert to be installed underneath. We undertook the design of the pipe support bridge and offered a cost effective temporary bridging solution that enabled the culvert to be installed on time and within the allocated budget.